Ride out of Gettysburg at the speed of a bicycle and the battlefield opens up. Farm fields spread north of town. The woods close in around Culp’s Hill. The ground turns to boulders at Devil’s Den and the Wheatfield, and the climb to Little Round Top follows. Monuments stand at nearly every turn, close enough to stop and read.
The National Park Service (NPS) now proposes to give more riders that experience. NPS is taking comments on a Trails Plan for Gettysburg National Military Park (NMP) and Eisenhower National Historic Site (NHS) that would add about 3.7 miles of trail open to bicycles and e-bikes. Today, visitors traveling between the two parks have no safe, dedicated connection and must ride roads posted at up to 40 mph. New trails along Emmitsburg Road, Baltimore Pike, and Eisenhower Farm Lane would move them off those roads.
BlueRibbon Coalition (BRC) supports the bicycle and e-bike provisions in the plan and asks NPS to open more of the new trail network to bikes. Comments are due December 2, 2026.
Where bikes and e-bikes would be allowed
Currently there is:
- 3.8 miles of multi-use trail where bikes and pedestrians share the path.
- 56.3 miles of recommended on-road bike routes.
- 0.74 pedestrian trail open to e-bikes
What the plan proposes:
- 3.0 miles of new multi-use trail, which takes that total to 6.8 miles (allows e-bikes).
- 21.7 miles of recommended on-road routes (not bike trails), which takes that total to 78.0 miles.
- Keep Emmitsburg Road Multi-Use Trail which is .66 miles.
Counting the trail miles together, the plan adds about 3.7 miles of trail for bikes and e-bikes.

E-bikes are covered
The EA states that both parks allow e-bikes wherever they allow traditional bicycles and prohibit them where bicycles are prohibited. Both parks prohibit using the motor to move an e-bike without pedaling, except where the public may use motor vehicles. Under those rules, every mile of bike trail in the plan is also a mile of e-bike trail.
E-bike access in a national park unit is decided trail by trail. Under the NPS bicycle rule, 36 CFR 4.30, NPS must complete a planning process and environmental review for each trail, followed by a written determination approved by the regional director. This EA is the planning document for that process. If NPS reaches a finding of no significant impact, it would then publish the determinations in the Federal Register for a separate 30-day comment period. All of the proposed bike trails are inside developed areas, so the EA does not call for a special regulation.
The EA also describes the problem the new trails address. Visitors traveling between Gettysburg NMP and Eisenhower NHS have no safe, dedicated connection and must ride roads posted at up to 40 mph. The Emmitsburg Road, Baltimore Pike, and Eisenhower Farm Lane trails move riders off those roads.
The plan sets aside far more trail for walkers than for riders. It adds 13.3 miles of new pedestrian-only trail, compared with 3.0 miles of new bike and pedestrian trail. The EA says about 80 percent of the proposed network consists of existing mowed pathways that need only minor grading, drainage work, signs, and continued mowing. It also notes that Harman Farm Trail was previously proposed as a multi-use trail and is now pedestrian-only.
The Emmitsburg Road Multi-Use Trail (0.66 miles) is the one new bike trail the EA marks as pending. NPS would build it on the west side of Emmitsburg Road, inside the existing road right-of-way, from Steinwehr Avenue to Sickles Avenue. Because the road is outside NPS’s control, the EA says NPS would coordinate with the Pennsylvania Department of Transportation (PennDOT) and determine feasibility.
What BRC is asking NPS to do
- Adopt the bicycle and e-bike authorizations in the Proposed Action.
- Evaluate bicycle and e-bike use on more of the 13.3 miles of new pedestrian trail, including Harman Farm Trail, using the surface, safety, and user-conflict criteria in 36 CFR 4.30.
- Complete the PennDOT feasibility review for the Emmitsburg Road Multi-Use Trail so that the 0.66 miles stays in the plan.
Commenting
Submit a comment below in support of e-bike access in our national parks!
LEGAL ISSUES
Lawsuits & legal challenges
POLICY ISSUES
Regulations behind closures
OPERATION: ACCESSIBLE
Access for all
LATEST FIGHT
BRC Joins Fight for the Oregon Dunes
Learn about the case and how you keep riders on the Dunes.