The Bureau of Land Management (BLM) is taking comments on a draft Environmental Assessment (EA) that would open more mountain bike trails in its Colorado River Valley Field Office to Class 1 e-bikes. the Proposed Action would open 118 additional miles of existing trail to Class 1 e-bikes, a second alternative would open 187 additional miles, and No Action would leave current designations unchanged. Only about 18 of the field office’s 220-plus miles of singletrack are currently open to Class 1 e-bikes.
A 30 day comment period is now open for feedback on the potential e-bike route additions. This field office, manages the trails, which BLM runs in cooperation with the cities of Glenwood Springs and Rifle, Eagle County, Pitkin County Open Space, and the towns of Carbondale, Eagle, Gypsum, and New Castle. Local mountain bike groups asked BLM in January 2024 to consider allowing Class 1 e-bikes on the field office’s mountain bike trails.
The three alternatives
- Proposed Action: 118 additional miles of existing trail, according to BLM’s November 13 news release. The project page describes it as allowing Class 1 e-bikes on all designated mountain bike trails in the Crown and Hardscrabble-East Eagle Special Recreation Management Areas (SRMAs) and adjacent trails, and in the New Castle and Thompson Creek Extensive Recreation Management Areas (ERMAs).
- Second alternative: 187 additional miles of existing trail.
- No Action: current e-bike designations stay as they are.
Maps of the proposed alternatives
What Class 1 means and what stays the same
A Class 1 e-bike gives electric assistance only while the rider pedals, and the assistance ends at 20 miles per hour. The proposal covers only Class 1 e-bikes on designated mountain bike trails. It opens existing trails and does not build new ones. BLM states that no change to trail designations takes effect until the environmental review and decision are complete. The current 18 miles open to e-bikes simply isn’t enough to keep up with the growing demand for e-bike users.
Our members ride e-bikes, and on BLM land the number of trail miles open to them depends on the designation decision for each field office. Right now that is about 18 miles out of more than 220. BLM also links this review to its All Americans Outside initiative, which encourages people of all abilities to use public lands. The Proposed Action would add 118 miles. The second alternative would add 187. BRC believes opening all 187 mountain bike trails to e-bikes is the right choice. With more options, congestion is less likely which will lead to less “user conflict” aka non-motorized users disliking motorized users. With more trails open to e-bikes it’s less likely traditional mountain bikers will even come upon e-bikers.
We support the larger mileage addition
- Adopt the second alternative, which opens 187 additional miles. If BLM keeps the Proposed Action, explain in the Final EA why each mile of the second alternative was left out.
- Address user conflict, wildlife, and enforcement concerns with signage, rider education, and directional routes, and support any trail-specific limit with trail-specific analysis.
Use the form below to submit a comment by December 14, 2026.
LEGAL ISSUES
Lawsuits & legal challenges
POLICY ISSUES
Regulations behind closures
OPERATION: ACCESSIBLE
Access for all
LATEST FIGHT
BRC Joins Fight for the Oregon Dunes
Learn about the case and how you keep riders on the Dunes.




